![]() |
| Interior Coatings manufacturers china |
1. The retained samples were tested in the laboratory first, and the results were not abnormal, so the paint itself was excluded.
2. After arriving at the site, it was found that the construction temperature dropped to below 0 degrees in the near future, which was lower than the minimum construction temperature of 5 degrees
3, the construction site is airless spraying, the airless spray pressure is more easy to produce bubbles, and the low temperature condition is not easy to break.
2. After arriving at the site, it was found that the construction temperature dropped to below 0 degrees in the near future, which was lower than the minimum construction temperature of 5 degrees
3, the construction site is airless spraying, the airless spray pressure is more easy to produce bubbles, and the low temperature condition is not easy to break.

没有评论:
发表评论